South Magnolia Combined Sewer Overflow (CSO) Control
September, 2011: P&M teamed with TetraTech for the Preliminary and Final Engineering design of the South Magnolia Combined Sewer Overflow project. P&M provides proactive Cost Estimating and Critical Path Method Scheduling services.